Serving Glendale and the Verdugo foothills CSLB-licensed work only
(818) 791-1856

Contact

Call for a free quote anywhere in Glendale: the inspection booked on the call, the price in writing before any work, and never a price at the door.

Get hold of us

Call: it is the fastest way

An active leak is worth a phone call straight away - put a bucket under it and move what you can while you wait. For a repair or a replacement, the same call books the inspection, and the figure comes in writing before any work starts.

  • (818) 791-1856 - Mon to Sat, 7am to 8pm
  • Glendale, the Verdugo foothills and Montrose
  • Out-of-hours cover, priced before we set off
  • A free written quote, and no price given at the door
(818) 791-1856
When you call

What helps us quote

None of it is required, and nobody minds "I don't know" - it just shortens the first conversation.

  • Roughly how old the roof is, if you know
  • What the covering is - shingle, tile, metal or flat
  • What you are seeing - a stain, a drip, lifted or missing pieces
  • Whether it is a house, a condo or an apartment building
Where we work

Glendale, and the areas around it

The pin is the center of Glendale, not an office - this is a service-area business and the survey comes to you. Six Glendale districts and the two canyon neighborhoods, from the designated historic streets to the brush interface running up into the Verdugos.

  • Glendale
  • Montrose
  • Rossmoyne
  • Verdugo Woodlands
  • Adams Hill
  • Sparr Heights
  • Chevy Chase Canyon
  • Glenoaks Canyon
What happens next

Four steps, no surprises

A free inspection, the design-review position checked, then a written quote.

01

Call or message

Tell us the covering and the address. On a period Glendale property the address is the important part, because it decides whether design review applies before anything else does.

02

A free inspection, and a salvage count

Roof and attic together, and on tile the salvageable pieces counted. That count is the difference between a relay and a replacement, which is roughly half the job.

03

Design review FIRST, then the permit

On a designated property the Design Review Exemption has to be approved before a building permit application is accepted. Filed in that order, it is four to eight weeks. Filed the other way round, it is a month wasted.

04

Written scope, written quote, then the work

Profile, color and texture matched to what is there. Eaves and rafter tails documented before and after, which is what a review wants to see.

Want a number on it?

A free written quote, no obligation.

Call (818) 791-1856