How we work in Glendale: the buildings we take on, how the survey runs, how the quote is written, and the jobs we turn down and why.
We work on houses and small residential buildings in Glendale and the areas around it. That is a deliberate limit: the housing here is a known quantity, and knowing it is most of the job.
Every survey covers the attic as well as the roof, because the entry point and the stain are rarely in the same place. Every job is photographed slope by slope. Every price is against a written scope, with sheathing priced per sheet.

A free inspection, the design-review position checked, then a written quote.
Tell us the covering and the address. On a period Glendale property the address is the important part, because it decides whether design review applies before anything else does.
Roof and attic together, and on tile the salvageable pieces counted. That count is the difference between a relay and a replacement, which is roughly half the job.
On a designated property the Design Review Exemption has to be approved before a building permit application is accepted. Filed in that order, it is four to eight weeks. Filed the other way round, it is a month wasted.
Profile, color and texture matched to what is there. Eaves and rafter tails documented before and after, which is what a review wants to see.
Including ours. There are enough door-knockers working this valley that the checks are worth making on anybody.
Roofing is licensed work in California under classification C-39. Do not take the number on trust or off a van door -- the CSLB register is public and it settles the question in a minute.
On a clay roof this is the difference between $8,000 and $60,000. A quote for a full replacement written without a salvage count is not a high price, it is a price for a different job.
On a designated Glendale property the Design Review Exemption has to be approved before the permit application is accepted. A contractor who plans to file them the other way round will cost you a month.
Nobody can know how much decking needs replacing before the covering is off. It should be a rate per sheet in the scope, not a lump guess and not a change order.
On a canyon lot a good part of the roof cannot be seen from the street at all, and on a designated property the detailing that costs money is the detailing you cannot make out from below. A figure offered before anyone has been up is not a price yet.
A free written quote, no obligation.